Visy VP8 Building, Murarrie, Qld
Plexxcon are a newly formed tier 2 construction company that started in 2021. Plexxcon specialize in the more complex jobs normally involving some form of hazardous materials removal.
Plexxcon are a newly formed tier 2 construction company that started in 2021. Plexxcon specialize in the more complex jobs normally involving some form of hazardous materials removal.
Our scope included Environmental cleaning to all horizontal surfaces within the plantroom, Asbestos containing dust throughout the plantrooms, Friable Asbestos removal on AHU opening panels…
Our trained technician’s role at the steelworks was to perform maintenance works where asbestos was present, using strict asbestos control measures. This ensured that maintenance works could continue safely without risk of exposure to the usual BlueScope maintenance staff.
Recently we completed asbestos remediation works at the 10-storey apartment complex, Garfield – on The Beach, in the heart of the Gold Coast. Carefully planned sequencing of works allowed Demex to follow closely behind our works with the safe demolition of the structure.
Over the duration of 14 days, Aztech Services Australia was engaged to undertake the remediation of Class A friable contaminated soil, within the Tarrkarri site, Lot Fourteen Precinct.
Recently completed in June, our ACT crew worked alongside local Canberra company, Manteena, on a Government building in Yarralumla. This building required hail damage remediation to the estimated project value of just over $80k.
Aztech Services Australia (ACT Branch) implemented the use of Dry Ice Blasting for the first time in the removal of Lead Paint in the Powerhouse Building located close to Canberra Airport.
We were recently engaged to remove concrete plinths that had been covered with an asbestos waterproofing membrane at a site in Phillip, ACT. During the removal of the plinths, extensive soil contamination was identified, and we were subsequently engaged to remediate the site.
Amidst the Covid-19 lockdowns in Sydney, Aztech Services Australia teamed up with Creative Resolution to remediate a decommissioned industrial site in Botany.
Hazmat remediation and strip out to a city block consisting of 6 multi-story buildings and a shopping centre off one of the highest trafficked streets in the Adelaide CBD.
Aztech Services has expanded our capability and begun managing commercial building works within the South-east Queensland region. To date, our core clientele are utility provider Energex and the construction branch of the state government, QBuild.
Aztech Services were engaged to assist BMD and SEQ Water with the remediation of asbestos containing materials within expansion and construction joints at the site, as part a major filter upgrade to the Water Treatment Plant.
Aztech Services Australia was engaged by Kane Constructions to complete lead removal works over two warehouses at the City of Gold Coast Carrara Depot as a part of the roof upgrade project.
The redevelopment of the five-hectare site within the Herston Health Precinct began in March 2017. The $1.1 billion dollar transformation of Herston Quarter entails delivery of a mixed-use community hub which will cater for health, residential, commercial and retail opportunities.
Aztech Services Australia (Aztech Services) and McMahon Services (MCM) joined forces for Built to remediate and remove a friable asbestos contaminated roof on a heritage listed building in Sydney’s CBD.
Aztech Services Australia was engaged by CMA Contracting to assist in the remediation of 24 sites owned by HAKK. The sites included contaminated residential properties, a disused municipal landfill and a stockpile site within HAKK.