Location: Adelaide, South Australia
Client: Widi Ngaruwa & Lend Lease
Service: Asbestos contaminated soil
Value: $0.8 Million
Duration: March – April 2022
Project Details
Over the duration of 14 days, Aztech Services Australia was engaged to undertake the remediation of Class A friable contaminated soil, within the Tarrkarri site, Lot Fourteen Precinct. Endorsed remediation methods from the EPA and Safe Work SA were adopted to undertake the work enabling a safe, cost effective and practical approach.
With the remediation undertaken in the heart of Adelaide, public and multiparty communication was key to successfully completing the high-risk project. Daily information sessions were conducted with stakeholders and the public to communicate commitments that ensured safe working environments, and to consider expectations and simultaneous operations.
Project Facts
- 80 semi tipper loads of friable asbestos waste material.
- Asbestos loads were effectively packaged, safely transported, and disposed of within 14 days.
- 544 hours worked with zero incidents, community complaints or environmental incidents.
![1. Takkarri](https://aztechservices.com.au/wp-content/uploads/elementor/thumbs/1.-Takkarri-q96ow35kxq0s6hv9ooo9y6wyxjidyo7asiewcgbjpk.png)
![3. Techs edited](https://aztechservices.com.au/wp-content/uploads/elementor/thumbs/3.-Techs-edited-e1674023928978-q96ow519be3ctpsjdphj36fw4b94e2ergrpvb08rd4.png)
![2. Load out edited](https://aztechservices.com.au/wp-content/uploads/elementor/thumbs/2.-Load-out-edited-q96ow6wxp25xgxpt2qas85ytb2zutgm8510u9k5z0o.png)