Buildcorp, Sydney CBD, NSW

Our scope included Environmental cleaning to all horizontal surfaces within the plantroom, Asbestos containing dust throughout the plantrooms, Friable Asbestos removal on AHU opening panels…

Sir Joseph Banks Drive, Botany, NSW

Amidst the Covid-19 lockdowns in Sydney, Aztech Services Australia teamed up with Creative Resolution to remediate a decommissioned industrial site in Botany.

Built HQ, Sydney CBD, NSW

Aztech Services Australia (Aztech Services) and McMahon Services (MCM) joined forces for Built to remediate and remove a friable asbestos contaminated roof on a heritage listed building in Sydney’s CBD.

Hydro Aluminium, Kurri Kurri, NSW

Aztech Services Australia was engaged by CMA Contracting to assist in the remediation of 24 sites owned by HAKK. The sites included contaminated residential properties, a disused municipal landfill and a stockpile site within HAKK.